| 2025 |
Evarist, C., Luvara, V. G. M., & Chileshe, N. (2025). Rethinking the recruitment and selection practices of indigenous building contractors in Dar es Salaam, Tanzania: criteria and methods. International Journal of Construction Management, 25(2), 149-160. DOI |
| 2025 |
Kavishe, N., Zulu, S., Musonda, I., Zulu, E., Chileshe, N., & Kineber, A. F. (2025). Investigating challenges in achieving sustainable urban infrastructure development in informal settlements. Smart and Sustainable Built Environment, online, 1-16. DOI |
| 2025 |
Thompson, D., Chileshe, N., Coggins, J., & Stevels, A. (2025). COVID-19 challenges on construction-related SMEs and response strategies - a scoping review. The International Journal of Construction Management, online(14), 1-11. DOI |
| 2025 |
Tennakoon, G. A., Rameezdeen, R., & Chileshe, N. (2025). Understanding the limited uptake of reprocessed construction materials: a pro-environmental behaviour perspective. Sustainable Development, 33(4), 5134-5150. DOI |
| 2025 |
Mahinkanda, M., Ochoa, J. J., Chileshe, N., Rameezdeen, R., & Gu, N. (2025). Optimizing design decisions for construction waste minimization through an interpretive structural modelling approach. Built Environment Project and Asset Management, online(5), 1-19. DOI |
| 2025 |
Manzoor, B., Othman, I., Qureshi, A. H., & Chileshe, N. (2025). Impact of safety accidental factors on safety performance for high-rise building projects: eFA-SEM approach. Advances In Civil And Architectural Engineering, 16(30), 207-229. DOI |
| 2025 |
Tennakoon Mudiyanselage, M. P. T., Chileshe, N., Rameezdeen, R., Ochoa, J. J., & Samaraweera, A. (2025). Mixed methods framework for implementation research in the architecture, engineering, construction and operations industry. International Journal of Construction Management, online, 1-15. DOI |
| 2025 |
Daoud, A. O., Kineber, A. F., Chileshe, N., Elmansoury, A., & Abdel Aziz, K. M. (2025). Investigating barriers to drones implementation in sustainable construction using PLS-SEM. Scientific Reports, 15(1, article no. 19623), 1-20. DOI |
| 2025 |
Tennakoon, T. M. M. P., Chileshe, N., Rameezdeen, R., Ochoa, J. J., & Samaraweera, A. (2025). Modelling the effect of transaction cost determinants and governance on Australian offsite construction supply chain resilience. Engineering, Construction and Architectural Management, 32(13), 104-132. DOI |
| 2025 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2025). Information processing model for quality assurance in reverse logistics supply chains of demolition waste. Engineering Construction and Architectural Management, 32(13), 193-212. DOI |
| 2025 |
Dayan, V., Chileshe, N., Hassanli, R., & Parvaneh, A. (2025). Sustainable bridge management using refined feature selection for machine learning-aided bridge condition prediction: incorporation of Pareto distribution in MRMR method. Applied Soft Computing, 184(113878), 1-15. DOI |
| 2025 |
Tennakoon Mudiyanselage, M. P. T., Chileshe, N., Rameezdeen, R., Ochoa Paniagua, J., Samaraweera, A., & Statsenko, L. (2025). Uncertainties affecting the offsite construction supply chain resilience: a systematic literature review. Construction Innovation, 25(3), 912-930. DOI Scopus7 WoS9 |
| 2024 |
Nguyen, T., Tran, Q. P., Chileshe, N., Huynh, T. Y. T., & Hallo, L. (2024). Risk prioritization using analytic process network for metro rail implementation projects in developing countries: a typical case study of Vietnam. International Journal of Construction Management, 24(10), 1077-1089. DOI Scopus5 WoS4 |
| 2024 |
Imbiri, S., Rameezdeen, R., Chileshe, N., & Statsenko, L. (2024). Risk propagation and resilience in the agribusiness supply chain: a systematic literature review. Journal of Agribusiness in Developing and Emerging Economies, 14(4), 712-732. DOI Scopus8 WoS8 |
| 2024 |
Hallo, L., Nguyen, T., Chileshe, N., & Nguyen, B. Q. V. (2024). Complex system management: intuition and/or analysis with artificial intelligence involvement. Systems Research and Behavioral Science, online, 1-16. DOI |
| 2024 |
Wickramaarachchige, M. W., Statsenko, L., Ochoa, J. J., Mayer, W., & Chileshe, N. (2024). Critical enablers for the development of sectoral innovation ecosystems: a conceptual framework. Cogent Business and Management, 11(1, article no. 2414858), 1-25. DOI Scopus2 WoS1 |
| 2024 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2024). Integrating quality into the reverse logistics in construction: an empirical study in South Australia. Built Environment Project and Asset Management, 15(3), 17 pages. DOI Scopus1 WoS1 |
| 2024 |
Alankarage, S., Chileshe, N., Samaraweera, A., Rameezdeen, R., & Edwards, D. J. (2024). Diagnosing organizational BIM culture: a qualitative case study using Schein's model. Journal of Management in Engineering, 40(3), 1-13. DOI WoS5 |
| 2024 |
Charles, Q. W., Sospeter, N. G., Kikwasi, G., & Chileshe, N. (2024). Attraction and retention factors for female students into construction-related programs in developing countries: the case of Tanzania. International Journal of Construction Education and Research, 20(3), 263-283. DOI |
| 2024 |
Nguyen, T., Chileshe, N., Ho, D. T., Nguyen, V. T., & Tram, Q. P. (2024). Significant risks that trigger cost overruns and delays in urban rail projects: a typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), 278-295. DOI Scopus3 WoS3 |
| 2024 |
Owojori, O. M., Okoro, C., & Chileshe, N. (2024). Actualising social sustainability through adaptive reuse innovations within the context of sustainable development. International Journal of Construction Management, 24(4), 411-421. DOI |
| 2024 |
Tennakoon, G. A., Rameezdeen, R., & Chileshe, N. (2024). Walking the talk towards sustainable consumption: interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), 2878-2899. DOI |
| 2024 |
Kineber, A. F., Othman, I., Oke, A. E., Chileshe, N., & Zayed, T. (2024). Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), 1380-1480. DOI |
| 2024 |
Olanrewaju, O. I., Chileshe, N., Adekunle, E. O., & Salihu, C. (2024). Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), 1485-1498. DOI |
| 2024 |
Aghimien, D., Aigbavboa, C., Thwala, W., Chileshe, N., & Dlamini, B. (2024). Help, I am not coping with my job! - a work-life balance strategy for the Eswatini construction industry. Engineering, Construction and Architectural Management, 31(13), 140-159. DOI |
| 2024 |
Tennakoon, M. M. P. T., Chileshe, N., Rameezdeen, R., Ochoa, J. J., & Samaraweera, A. (2024). Enhancing supply chain resilience in offsite construction through the procurement strategy: a systematic literature review. Construction Innovation, online, 1-20. DOI |
| 2024 |
Wang, Z., Hu, T., Liu, J., Xia, B., & Chileshe, N. (2024). Spatial differences, evolutionary characteristics and driving factors on economic resilience of the construction industry: evidence from China. Engineering, Construction and Architectural Management, online(10), 1-29. DOI Scopus8 |
| 2024 |
Abad, F., Rameezdeen, R., & Chileshe, N. (2024). Circular economy design strategies in mass timber construction: a systematic literature review. Smart and Sustainable Built Environment, online, 1-23. DOI |
| 2024 |
Al Mekhlafi, A. B. A., Isha, A. S. N., Chileshe, N., Kineber, A. F., Ajmal, M., Baarimah, A. O., & Al Aidrous, A. H. M. H. (2024). Risk assessment of driver performance in the oil and gas transportation industry: analyzing the relationship between driver vigilance, attention, reaction time, and safe driving practices. Heliyon, 10(6, article no. e27668), 1-11. DOI |
| 2023 |
Smith, J., Edwards, D. J., Martek, I., Chileshe, N., Hayhow, S., & Roberts, C. (2023). The antecedents of construction project change: an analysis of design & build procurement application. Journal of Engineering, Design and Technology, 21(3), 655-689. DOI Scopus35 WoS30 |
| 2023 |
Hewa Alankarage, S., Chileshe, N., Rameezdeen, R., Edwards, D. J., & Samaraweera, A. (2023). Exploring BIM-triggered organisational and professional culture change: a systematic literature review. Construction Innovation, 23(1), 229-246. DOI Scopus22 WoS18 |
| 2023 |
Chileshe, N., Kavishe, N., & Edwards, D. J. (2023). Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: the case of Tanzania. International Journal of Construction Management, 23(3), 495-504. DOI Scopus16 |
| 2023 |
Jayasinghe, R., Rameezdeen, R., & Chileshe, N. (2023). Modelling the cause-and-effect relationships risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), 4018-444044. DOI |
| 2023 |
Okwe, E. I., Olanrewaju, O. I., Heckman, M., & Chileshe, N. (2023). Barriers to building information modelling and facility management practices integration in Nigeria. Journal of Facilities Management, 21(5), 845-865. DOI |
| 2023 |
Tennakoon, G. A., Rameezdeen, R., & Chileshe, N. (2023). Why not reprocessed: Identifying factors limiting the uptake of reprocessed structural timber. Built Environment Project and Asset Management, 13(3), 471-487. DOI |
| 2023 |
Okoro, C., Nnaji, C., Chileshe, N., & Tembo, J. (2023). Perceptions of public-private partnerships transportation project success factors in developing countries: an explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), 295-327. DOI |
| 2023 |
Alankarage, S., Chileshe, N., Samaraweera, A., Rameezdeen, R., & Edwards, D. J. (2023). Guidelines for using a case study approach in construction culture research: application to BIM-enabled organizations. Journal of Construction Engineering and Management, 149(9), 1-13. DOI Scopus8 WoS8 |
| 2023 |
Abdel Tawab, M., Kineber, A. F., Chileshe, N., Abanda, H., Ali, A. H., & Almukhtar, A. (2023). Building information modelling implementation model for sustainable building projects in developing countries: a PLS-SEM approach. Sustainability, 15(12, article no. 9242), 1-21. DOI Scopus36 |
| 2023 |
Kavishe, N., Zulu, S. L., Luvara, V., Zulu, E., Musonda, I., Moobela, C., & Chileshe, N. (2023). Exploring constraining factors for use of private sector finance in delivery of public sector infrastructure in Tanzania: a qualitative study. Frontiers in Built Environment, section Construction Management, 9(1098490), 1-13. DOI |
| 2023 |
Mahinkanda, M. M. M. P., Ochoa Paniagua, J. J., Rameezdeen, R., Chileshe, N., & Gu, N. (2023). Design decision-making for construction waste minimisation: a systematic literature review. Buildings, 13(11, article no. 2763), 1-23. DOI |
| 2023 |
Wang, Z., Qin, F., Liu, J., Xia, B., & Chileshe, N. (2023). Spatial differentiation of carbon emissions reduction potential for construction and demolition waste recycling. Environmental Science and Pollution Research, 30(58), 122304-122321. DOI Scopus5 |
| 2023 |
Tennakoon, G. A., Rameezdeen, R., & Chileshe, N. (2023). Identifying factors affecting the low uptake of reprocessed construction materials: a systematic literature review. Waste Management and Research, 41(4), 781-800. DOI |
| 2023 |
Hewa Alankarage, S., Chileshe, N., Samaraweera, A., Rameezdeen, R., & Edwards, D. J. (2023). Organisational BIM maturity models and their applications: a systematic literature review. Architectural Engineering and Design Management, 19(6), 567-585. DOI Scopus23 WoS26 |
| 2023 |
Kineber, A. F., Othman, I., Oke, A., Chileshe, N., & Zayed, T. (2023). Value management implementation barriers for sustainable building: a bibliometric analysis and partial least square structural equation modeling. Construction Innovation, 23(1), 38-73. DOI |
| 2023 |
Evarist, C., Luvara, V. G. M., & Chileshe, N. (2023). Perception on constraining factors impacting recruitment and selection practices of building contractors in Dar es Salaam, Tanzania. International Journal of Construction Management, 23(12), 2012-2023. DOI |
| 2023 |
Osei Kyei, R., Narbaev, T., Atafo Adabre, M., Chileshe, N., & Ofori Kuragu, J. K. (2023). Critical success criteria for retirement village public-private partnership housing. Construction Innovation, 23(5), 1018-1037. DOI Scopus7 |
| 2023 |
Nguyen, T., Hallo, L., Chileshe, N., & Nguyen, N. H. (2023). Towards a sustainable integrated management approach to uncertainty surrounding COVID-19. Systems Research and Behavioral Science, 40(6), 1-17. DOI Scopus5 WoS1 |
| 2023 |
Statsenko, L., Samaraweera, A., Bakhshi, J., & Chileshe, N. (2023). Construction 4.0 technologies and applications: a systematic literature review of trends and potential areas for development. Construction Innovation, 23(5), 961-993. DOI Scopus74 WoS61 |
| 2023 |
Nafe Assafi, M., Hossain, M. M., Chileshe, N., & Datta, S. D. (2023). Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector. Construction Innovation, 23(5), 1255-1278. DOI Scopus21 WoS20 |
| 2023 |
Nguyen, T. H. D., Chileshe, N., Rameezdeen, R., & Wood, A. (2023). Strategic responses to external stakeholder influences. International Journal of Project Management, 41(1), 1-18. DOI Scopus20 WoS20 |
| 2023 |
Imbiri, S., Rameezdeen, R., Chileshe, N., & Statsenko, L. (2023). Stakeholder perspectives on supply chain risks: the case of Indonesian palm oil industry in West Papua. Sustainability, 15(12, article no. 9605), 1-24. DOI Scopus5 WoS3 |
| 2023 |
Hallo, L., Nguyen, T., & Chileshe, N. (2023). Investigating practical wisdom in complex system management: What is it and how do we get more?. Systems Research and Behavioral Science, 41(2), 316-337. DOI Scopus2 WoS2 |
| 2022 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2022). Information-centric influence strategies for quality assurance in reverse logistics supply chains: external stakeholders' perspective. Benchmarking: An International Journal, 29(6), 1857-1888. DOI Scopus10 WoS8 |
| 2022 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2022). Information Processing for Quality Assurance in Reverse Logistics Supply Chains: An Organizational Information Processing Theory Perspective. Sustainability, 14(9), 5493. DOI Scopus7 WoS6 |
| 2022 |
Nguyen, T., Nguyen, L. H., Chileshe, N., & Hallo, L. (2022). Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, Early cite(Early cite), 1-14. DOI Scopus7 WoS7 |
| 2022 |
Statsenko, L., Chileshe, N., Volk, R., & Warrian, P. (2022). Guest editorial. Journal of Engineering, Design and Technology, 20(2), 385-387. DOI |
| 2022 |
Le, P. T., Kirytopoulos, K., Chileshe, N., & Rameezdeen, R. (2022). Taxonomy of risks in PPP transportation projects: a systematic literature review. International journal of construction management, 22(2), 166-181. DOI |
| 2022 |
Olanrewaju, O. I., Enegbuma, W. I., Donn, M., & Chileshe, N. (2022). Building information modelling and green building certification systems: a systematic literature review and gap spotting. Sustainable Cities and Society, 81(103865), 1-19. DOI |
| 2022 |
Olanrewaju, O. I., Kineber, F. A., Chileshe, N., & Edwards, D. J. (2022). Modelling the relationship between Building Information Modelling (BIM) implementation barriers, usage and awareness on building project lifecycle. Building and Environment, 207(108556), 1-15. DOI Scopus151 WoS130 |
| 2022 |
Shoar, S., Chileshe, N., & Payan, S. (2022). Assessment of the causes and effects of design deficiencies for large construction projects using social network analysis. International Journal of Managing Projects in Business, 15(2), 371-395. DOI |
| 2022 |
Chileshe, N., & Kavishe, N. (2022). Human capacity building strategies for improving PPP implementation in Tanzanian construction projects. Built Environment Project and Asset Management, 12(6), 906-923. DOI |
| 2022 |
Dayan, V., Chileshe, N., & Hassanli, R. (2022). A scoping review of information-modeling development in bridge management systems. Journal of Construction Engineering and Management, 148(9, article no. 03122006), 1-14. DOI Scopus30 WoS26 |
| 2022 |
Sospeter, N. G., Kikwasi, G. J., & Chileshe, N. (2022). Barriers to mentoring of graduates in quantity surveying firms in Tanzania: a factor analysis approach. International Journal of Construction Education and Research, 18(4), 295-314. DOI |
| 2022 |
Kineber, A. F., Siddharth, S., Chileshe, N., Alsolami, B., & Hamed, M. M. (2022). Addressing of value management implementation barriers within the Indian construction industry: a PLS-SEM approach. Sustainability, 14(24, article no. 16602), 1-24. DOI |
| 2022 |
Kineber, A. F., Mohandes, S. R., ElBehairy, H., Chileshe, N., Zayed, T., & Fathy, U. (2022). Towards smart and sustainable urban management: a novel value engineering decision-making model for sewer projects. Journal of Cleaner Production, 375(134069), 1-16. DOI |
| 2022 |
Makabate, C. T., Musonda, I., Okoro, C. S., & Chileshe, N. (2022). Scientometric analysis of BIM adoption by SMEs in the architecture, construction and engineering sector. Engineering, Construction and Architectural Management, 29(1), 179-203. DOI |
| 2022 |
Edwards, D. J., Akhtar, J., Rillie, I., Chileshe, N., Lai, J. H. K., Roberts, C. J., & Ejohwomu, O. (2022). Systematic analysis of driverless technologies. Journal of Engineering, Design and Technology, 20(6), 1388-1411. DOI Scopus45 WoS39 |
| 2022 |
Kineber, A. F., Othman, I., Oke, A., & Chileshe, N. (2022). Modelling the relationship between value management's activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, 20(2), 414-435. DOI |
| 2022 |
Nguyen, D., Rameezdeen, R., Chileshe, N., & Coggins, J. (2022). Effect of customer cooperative behavior on reverse logistics outsourcing performance in the construction industry - a partial least squares structural equation modeling approach. Engineering, Construction and Architectural Management, 29(9), 3345-3362. DOI Scopus6 |
| 2022 |
Kavishe, N., & Chileshe, N. (2022). Development and validation of public-private partnerships framework for delivering housing projects in developing countries: a case of Tanzania. International journal of construction management, 22(5), 873-890. DOI |
| 2022 |
Jacqueline, J., Konstantinos, K., & Chileshe, N. (2022). Isomorphism within risk-management practices of the Australian construction industry. International Journal of Construction Management, 22(8), 1508-1524. DOI |
| 2022 |
Chileshe, N., Njau, C. W., Kibichii, B. K., Macharia, L. N., & Kavishe, N. (2022). Critical success factors for Public-Private Partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), 1606-1617. DOI |
| 2022 |
Shoar, S., Chileshe, N., & Edwards, D. J. (2022). Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: application of random forest regression. Journal of Building Engineering, 50(1, article no. 104102), 1-18. DOI |
| 2022 |
Zulu, E., Zulu, S., Chabala, M., Musonda, I., Kavishe, N., & Chileshe, N. (2022). Challenges and advocated solutions for environmental protection legislation for building infrastructure projects in developing countries: evidence from Zambia. Project Leadership and Society, 3(100056), 1-11. DOI |
| 2022 |
Hughes, B., Edwards, D. J., Martek, I., Chileshe, N., & Thwala, W. D. (2022). Assessing the 'clerk of works' role in delivering quality affordable housing: a UK case study. Smart and Sustainable Built Environment, 11(4), 996-1016. DOI Scopus11 WoS11 |
| 2022 |
Tennakoon, G. A., Rameezdeen, R., & Chileshe, N. (2022). Diverting demolition waste toward secondary markets through integrated reverse logistics supply chains: a systematic literature review. Waste Management and Research, 40(3), 274-293. DOI |
| 2021 |
Kaluarachchi, M., Waidyasekara, A., Rameezdeen, R., & Chileshe, N. (2021). Mitigating dust pollution from construction activities: a behavioural control perspective. Sustainability, 13(16), 1-19. DOI |
| 2021 |
Burton, E., Edwards, D. J., Roberts, C., Chileshe, N., & Lai, J. H. K. (2021). Delineating the implications of dispersing teams and teleworking in an agile UK construction sector. Sustainability, 13(17), 1-20. DOI Scopus21 WoS15 |
| 2021 |
Chileshe, N., & Kavishe, N. (2021). Readiness assessment of public-private partnerships (PPPs) adoption in developing countries: the case of Tanzania. Built Environment Project and Asset Management, 11(1), 71-87. DOI |
| 2021 |
Owusu Manu, D. G., Debrah, C., Amissah, L., Edwards, D. J., & Chileshe, N. (2021). Exploring the linkages between project manager's mindset behaviour and project leadership style in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 28(9), 2690-2711. DOI Scopus29 WoS23 |
| 2021 |
Nguyen, D. T., Rameezdeen, R., Chileshe, N., & Coggins, J. (2021). Third-party reverse logistics service provider selection approaches and criteria: a literature review. International Journal of Logistics Systems and Management, 40(3), 396-422. DOI Scopus2 |
| 2021 |
Chileshe, N., Kavishe, N., & Edwards, D. J. (2021). Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania. Construction Innovation, 21(2), 182-202. DOI Scopus30 WoS22 |
| 2021 |
Nikmehr, B., Hosseini, M. R., Wang, J., Chileshe, N., & Rameezdeen, R. (2021). BIM-based tools for managing construction and demolition waste (CDW): a scoping review. Sustainability, 13(15), 1-20. DOI |
| 2021 |
Sospeter, N. G., & Chileshe, N. (2021). Risk handling responsibilities in Tanzanian project-based organisations. Sustainability, 13(14), 1-18. DOI |
| 2021 |
Al Mekhlafi, A. B. A., Isha, A. S. N., Chileshe, N., Abdulrab, M., Saeed, A. A. H., & Kineber, A. F. (2021). Modelling the relationship between the nature of work factors and driving performance mediating by role of fatigue. International Journal of Environmental Research and Public Health, 18(6752), 1-17. DOI |
| 2021 |
Lau, E., Hou, H. C., Lai, J. H. K., Edwards, D., & Chileshe, N. (2021). User-centric analytic approach to evaluate the performance of sports facilities: a study of swimming pools. Journal of Building Engineering, 44(102951), 1-31. DOI |
| 2021 |
Kineber, A. F., Othman, I., Oke, A. E., Chileshe, N., & Buniya, M. K. (2021). Impact of value management on building projects success: structural equation modeling approach. Journal of Construction Engineering and Management, 147(4), 1-15. DOI |
| 2021 |
Kineber, A. F., Othman, I., Oke, A. E., Chileshe, N., & Zayed, T. (2021). Exploring the value management critical success factors for sustainable residential building - a structural equation modelling approach. Journal of Cleaner Production, 293(126115), 1-17. DOI |
| 2021 |
Le, P., Chileshe, N., Kirytopoulos, K., & Rameezdeen, R. (2021). Exploring the underlying relationship among risks in BOT transportation projects in developing countries: the case of Vietnam. Journal of Financial Management of Property and Construction, 26(1), 101-125. DOI |
| 2021 |
Olanrewaju, O., Babarinde, S., Chileshe, N., & Sandanayake, M. (2021). Drivers for implementation of building information modeling (BIM) within the Nigerian construction industry. Journal of Financial Management of Property and Construction, 26(3), 366-386. DOI |
| 2021 |
Olanrewaju, O. I., Kineber, F. A., Chileshe, N., & Edwards, D. J. (2021). Modelling the impact of building information modelling (BIM) implementation drivers and awareness on project lifecycle. Sustainability, 13(16, article no. 8887), 1-23. DOI Scopus90 WoS78 |
| 2021 |
Al Mekhlafi, A. B. A., Isha, A. S. N., Chileshe, N., Abdulrab, M., Kineber, A. F., & Ajmal, M. (2021). Impact of safety culture implementation on driving performance among oil and gas tanker drivers: a partial least squares structural equation modelling (PLS-SEM) approach. Sustainability, 13(16, article no. 8886), 1-17. DOI |
| 2021 |
Omopariola, E., Windapo, A., Edwards, D. J., & Chileshe, N. (2021). Attributes and impact of advance payment system on cash flow, project, and organizational performance. Journal of Financial Management of Property and Construction, 27(3), 306-322. DOI Scopus8 WoS7 |
| 2021 |
Shoar, S., & Chileshe, N. (2021). Exploring the causes of design changes in building construction projects: an interpretive structural modeling approach. Sustainability, 13(17, article no. 9578), 1-23. DOI |
| 2021 |
Odusanya, S., Ochoa, J. J., Chileshe, N., & Ahn, S. (2021). Linking complexity factors and project management approaches to performance: an embedded single case study of IT-enabled change projects in Australia. International Journal of Managing Projects in Business, 14(7), 1504-1528. DOI |
| 2021 |
Nikjow, M. A., Liang, L., Qi, X., Sepasgozar, S. M. E., & Chileshe, N. (2021). Triggers of delays in international projects using engineering procurement and construction delivery methods in the belt and road initiative: case study of a high-speed railway projects. Sustainability, 13(17, article no. 9503), 1-21. DOI |
| 2021 |
Owojori, O. M., Okoro, C. S., & Chileshe, N. (2021). Current status and emerging trends on the adaptive reuse of buildings: a bibliometric analysis. Sustainability, 13(21, 11646), 1-18. DOI |
| 2021 |
Imbiri, S., Rameezdeen, R., Chileshe, N., & Statsenko, L. (2021). A Novel Taxonomy for Risks in Agribusiness Supply Chains: A Systematic Literature Review. Sustainability, 13(16), 9217. DOI Scopus21 WoS16 |
| 2021 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2021). Quality assurance in reverse logistics supply chain of demolition waste: A systematic literature review. Waste Management & Research: The Journal for a Sustainable Circular Economy, 39(1), 3-24. DOI Scopus52 WoS40 Europe PMC4 |
| 2021 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2021). Minimizing Macro-Level Uncertainties for Quality Assurance in Reverse Logistics Supply Chains of Demolition Waste. Sustainability, 13(23), 13069. DOI Scopus9 WoS9 |
| 2021 |
Wijewickrama, M. K. C. S., Chileshe, N., Rameezdeen, R., & Ochoa, J. J. (2021). Information sharing in reverse logistics supply chain of demolition waste: A systematic literature review. Journal of Cleaner Production, 280(1), 15 pages. DOI Scopus97 WoS83 |
| 2021 |
Wijewickrama, M. K. C. S., Rameezdeen, R., & Chileshe, N. (2021). Information brokerage for circular economy in the construction industry: A systematic literature review. Journal of Cleaner Production, 313(127938), 127938. DOI Scopus71 WoS67 |
| 2020 |
Nguyen, T. H. D., Chileshe, N., Rameezdeen, R., & Wood, A. (2020). Stakeholder influence strategies in construction projects. International Journal of Managing Projects in Business, 13(1), 47-65. DOI Scopus14 |
| 2020 |
Gorod, A., Hallo, L., Statsenko, L., Nguyen, T., & Chileshe, N. (2020). Integrating hierarchical and network centric management approaches in construction megaprojects using a holonic methodology. Engineering, Construction and Architectural Management, 28(3), 627-661. DOI Scopus13 WoS13 |
| 2020 |
Kineber, A. F., Othman, I., Oke, A. E., Chileshe, N., & Alsolami, B. (2020). Critical value management activities in building projects: a case of Egypt. Buildings, 10(12, article no. 239), 1-21. DOI |
| 2020 |
Olanrewaju, O. I., Edwards, D. J., & Chileshe, N. (2020). Estimating on-site emissions during ready mixed concrete (RMC) delivery: a methodology. Case Studies in Construction Materials, 13(e00439), 1-24. DOI Scopus21 WoS18 |
| 2020 |
Arashpour, M., Heidarpour, A., Nezhad, A. A., Hosseinifard, Z., Chileshe, N., & Hosseini, R. (2020). Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality. Construction management and economics, 38(6), 502-514. DOI |
| 2020 |
Kineber, A. F., Othman, I., Oke, A. E., Chileshe, N., & Buniya, M. K. (2020). Identifying and assessing sustainable value management implementation activities in developing countries: the case of Egypt. Sustainability, 12(9143), 1-21. DOI |
| 2020 |
Le, P. T., Chileshe, N., Kirytopoulos, K., & Rameezdeen, R. (2020). Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), 1401-1425. DOI |
| 2020 |
Edwards, D. J., Rillie, I., Chileshe, N., Lai, J., Hosseini, M. R., & Thwala, W. D. D. (2020). A field survey of hand-arm vibration exposure in the UK utilities sector. Engineering, Construction and Architectural Management, 27(9), 2179-2198. DOI Scopus56 WoS53 |
| 2020 |
Olanrewaju, O. I., Chileshe, N., Babarinde, S. A., & Sandanayake, M. (2020). Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), 2931-2958. DOI |
| 2020 |
Chileshe, N., Edwards, D. J., Kavishe, N., & Haupt, T. C. (2020). Perception on challenges impacting bid decision of indigenous building contractors in Dar es Salaam, Tanzania. Journal of Engineering, Design and Technology, 18(6), 1641-1662. DOI Scopus12 WoS9 |
| 2020 |
Kavishe, N., & Chileshe, N. (2020). Driving forces for adopting public-private partnerships in Tanzanian housing projects. International journal of construction management, 20(8), 912-927. DOI |
| 2020 |
Kurtzer, D., Blackmore, N., Farrugia, N., & Chileshe, N. (2020). Productivity enablers and inhibiting health and well-being practices of South Australian construction site-based workers: a qualitative study. International journal of construction management, 20(8), 882-899. DOI |
| 2019 |
Kavishe, N., Chileshe, N., & Jefferson, I. (2019). Public-private partnerships in Tanzanian affordable housing schemes: policy and regulatory issues, pitfalls and solutions. Built environment project and asset management, 9(2), 233-247. DOI |
| 2019 |
Chileshe, N., Jayasinghe, R. S., & Rameezdeen, R. (2019). Information flow-centric approach for reverse logistics supply chains. Automation in construction, 106(102858), 1-16. DOI |
| 2019 |
Kavishe, N., & Chileshe, N. (2019). Critical success factors in public-private partnerships (PPPs) on affordable housing schemes delivery in Tanzania: a qualitative study. Journal of facilities management, 17(2), 188-207. DOI |
| 2019 |
Jayasinghe, R. S., Rameezdeen, R., & Chileshe, N. (2019). Exploring sustainable post-end-of-life of building operations: a systematic literature review. Engineering, construction and architectural management, 26(4), 689-722. DOI |
| 2019 |
Kavishe, N., Jefferson, I., & Chileshe, N. (2019). Evaluating issues and outcomes associated with public-private partnership housing projects delivery: Tanzanian practitioners' preliminary observations. International journal of construction management, 19(4), 354-369. DOI |
| 2019 |
Jayasinghe, R. S., Chileshe, N., & Rameezdeen, R. (2019). Information-based quality management in reverse logistics supply chain: a systematic literature review. Benchmarking: An International Journal, 26(7), 2146-2187. DOI |
| 2019 |
Nguyen, T. H. D., Chileshe, N., Rameezdeen, R., & Wood, A. (2019). Stakeholder Influence Pathways in Construction Projects: Multicase Study. Journal of Construction Engineering and Management, 145(9), 05019011-1-05019011-14. DOI |
| 2019 |
Nguyen, T. H. D., Chileshe, N., Rameezdeen, R., & Wood, A. (2019). External stakeholder strategic actions in projects: A multi-case study. International Journal of Project Management, 37(1), 176-191. DOI Scopus51 |
| 2018 |
Nguyen, T. H. D., Chileshe, N., & Rameezdeen, R. (2018). External stakeholder strategic actions in construction projects: a Vietnamese study. Construction Management and Economics, 36(8), 443-458. DOI Scopus17 |
| 2018 |
Kavishe, N., Jefferson, I., & Chileshe, N. (2018). An analysis of the delivery challenges influencing public-private partnership in housing projects: the case of Tanzania. Engineering, construction and architectural management, 25(2), 202-240. DOI |
| 2018 |
Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., & Chileshe, N. (2018). Critical evaluation of off-site construction research: a scientometric analysis. Automation in construction, 87, 235-247. DOI |
| 2018 |
Hosseini, M. R., Bosch Sijtsema, P., Arashpour, M., Chileshe, N., & Merschbrock, C. (2018). A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction innovation, 18(1), 109-131. DOI |
| 2018 |
Hosseini, M. R., Martek, I., Chileshe, N., Zavadskas, E. K., & Arashpour, M. (2018). Assessing the Influence of virtuality on the effectiveness of engineering project networks: a 'Big Five Theory' perspective. Journal of construction engineering and management, 144(7), 1-12. DOI |
| 2018 |
Chileshe, N., Rameezdeen, R., Hosseini, M. R., Martek, I., Li, H. X., & Panjehbashi Aghdam, P. (2018). Factors driving the implementation of reverse logistics: A quantified model for the construction industry. Waste management, 79, 48-57. DOI Scopus121 Europe PMC9 |
| 2018 |
Munyasya, B. M., & Chileshe, N. (2018). Towards sustainable infrastructure development: Drivers, barriers, strategies, and coping mechanisms. Sustainability, 10(12, article no. 4341), 1-18. DOI |
| 2018 |
Mosfata, S., & Chileshe, N. (2018). Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural engineering and design management, 14(1-2), 139-157. DOI |
| 2018 |
Kavishe, N., & Chileshe, N. (2018). Identifying project management practices and principles for public-private partnerships in housing projects: The case of Tanzania. Sustainability, 10(12), 1-23. DOI |
| 2017 |
Nyongesa, H. O., Musumba, G. W., & Chileshe, N. (2017). Partner selection and performance evaluation framework for a construction-related virtual enterprise: a multi-agent systems approach. Architectural engineering and design management, 13(5), 344-364. DOI |
| 2017 |
Hosseini, R. M., Zavadskas, E. K., Xia, B., Chileshe, N., & Mills, A. (2017). Communications in hybrid arrangements: case of Australian construction project teams. Engineering economics, 28(3), 290-300. DOI |
| 2017 |
Nwachukwu, C. V., Udeaja, C., Chileshe, N., & Okere, C. E. (2017). The critical success factors for stakeholder management in the restoration of built heritage assets in the UK. International journal of building pathology and adaptation, 35(4), 304-331. DOI |
| 2017 |
Nikmehr, B., Hosseini, M. R., Rameezdeen, R., Chileshe, N., Ghoddousi, P., & Arashpour, M. (2017). An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, construction and architectural management, 24(6), 1246-1268. DOI |
| 2017 |
Hosseini, M., Chileshe, N., Baroudi, B., Izadpanahi, P., & Zuo, J. (2017). Virtuality of hybrid design teams within the construction context: A conceptual model. International Journal of Project Organisation and Management, 9(1), 1-17. DOI Scopus1 |
| 2016 |
Hosseini, M., Chileshe, N., Zuo, J., & Baroudi, B. (2016). The status quo of innovations within the construction industry: a conceptual model. International Journal of Project Organisation and Management, 8(3), 217-240. DOI Scopus4 |
| 2016 |
Hosseini, M., Chileshe,, N., Baroudi, B., Zuo, J., & Mills, A. (2016). Factors affecting perceived level of virtuality in hybrid construction project teams (HCPTs): a qualitative study. Construction Innovation, 16(4), 460-482. DOI Scopus14 WoS13 |
| 2016 |
Mostafa, S., Chileshe, N., & Abdelhamid, T. (2016). Lean and agile integration within offsite construction using discrete event simulation: a systematic literature review. Construction innovation, 16(4), 483-525. DOI |
| 2016 |
Chileshe, N., Hosseini, M. R., & Jepson, J. (2016). Critical barriers to implementing risk assessment and management practices (RAMP) in the Iranian construction sector. Journal of construction in developing countries, 21(2), 81-112. DOI |
| 2016 |
Hosseini, M. R., Banihashemi, S., Chileshe, N., Namzadi, M. O., Udaeja, C., Rameezdeen, R., & McCuen, T. (2016). BIM adoption within Australian small and medium-sized enterprises (SMEs): an innovation diffusion model. Construction economics and building, 16(3), 71-86. DOI |
| 2016 |
Perera, B. A. K. S., Ahamed, M. H. S., Rameezdeen, R., Chileshe, N., & Hosseini, M. R. (2016). Provision of facilities management services in Sri Lankan commercial organisations: is in-house involvement necessary?. Facilities, 34(7/8), 394-412. DOI |
| 2016 |
Hosseini, M. R., Chileshe, N., Jepson, J., & Arashpour, M. (2016). Critical success factors for implementing risk management systems in developing countries. Construction Economics and Building, 16(1), 18-32. DOI |
| 2016 |
Chileshe, N., Rameezdeen, R., & Hosseini, M. R. (2016). Drivers for adopting reverse logistics in the construction industry: a qualitative study. Engineering, Construction and Architectural Management, 23(2), 134-157. DOI |
| 2016 |
Shokri Ghasabeh, M., & Chileshe, N. (2016). Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), 127-157. DOI |
| 2016 |
Mignone, G., Hosseini, M. R., Chileshe, N., & Arashpour, M. (2016). Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital. Architectural engineering and design management, 12(5), 333-352. DOI |
| 2016 |
Yalegama, S., Chileshe, N., & Ma, T. (2016). Critical success factors for community-driven development projects: a Sri Lankan community perspective. International Journal of Project Management, 34(4), 643-659. DOI Scopus91 WoS76 |
| 2016 |
Rameezdeen, R., Chileshe, N., Hosseini, M. R., & Lehmann, S. (2016). A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. International journal of construction management, 16(3), 185-196. DOI |
| 2016 |
Chileshe, N., Rameezdeen, R., Hosseini, M. R., Lehmann, S., & Udeaja, C. (2016). Analysis of reverse logistics implementation practices by South Australian construction organisations. International Journal of Operations & Production Management, 36(3), 332-356. DOI |
| 2015 |
Mostafa, S., Abdelhamid, T., Chileshe, N., & Dumrak, J. (2015). Decision Support Model using ANP to align Leagile strategies to Offsite Manufacturing in Australia. International Journal of Analytic Hierarchy Process, 7(3), 374-404. DOI |
| 2015 |
Mostafa, S., Lee, S. H., Dumrakc, J., Chileshe, N., & Soltand, H. (2015). Lean thinking for a maintenance process. Production and Manufacturing Research, 3(1), 236-272. DOI Scopus80 |
| 2015 |
Yirenkyi Fianko, A. B., & Chileshe, N. (2015). An analysis of risk management in practice: the case of Ghana's construction industry. Journal of engineering, design and technology, 13(2), 240-259. DOI |
| 2015 |
Hosseini, M. R., Rameezdeen, R., Chileshe, N., & Lehmann, S. (2015). Reverse logistics in the construction industry. Waste management and research, 33(12), 1-16. DOI |
| 2015 |
Ghoddousi, P., Poorafshar, O., Chileshe, N., & Hosseini, M. R. (2015). Labour productivity in Iranian construction projects: perceptions of chief executive officers. International journal of productivity and performance management, 64(6), 811-830. DOI |
| 2015 |
Nguyen, T. P., & Chileshe, N. (2015). Revisiting the construction project failure factors in Vietnam. Built Environment Project and Asset Management, 5(4), 398-416. DOI Scopus70 |
| 2015 |
Hosseini, R., Chileshe, N., Rameezdeen, R., & Lehmann, S. (2015). Integration of design for reverse logistics and harvesting of information: a research agenda. International Journal of Logistics Systems and Management, 20(4), 480-515. DOI |
| 2015 |
Hosseini, M., Chileshe, N., Zuo, J., & Baroudi, B. (2015). Adopting global virtual engineering teams in AEC projects : a qualitative meta-analysis of innovation diffusion studies. Construction Innovation, 15(2), 151-179. DOI Scopus56 |
| 2015 |
Hosseini, M., Zuo, J., Chileshe, N., & Baroudi, B. (2015). Evaluating virtuality in teams: a conceptual model. Technology Analysis and Strategic Management, 27(4), 385-404. DOI Scopus15 WoS12 |
| 2015 |
Zuo, J., Pullen, S., Palmer, J., Bennetts, H., Chileshe, N., & Ma, T. (2015). Impacts of heat waves and corresponding measures: a review. Journal of Cleaner Production, 92, 1-12. DOI Scopus256 WoS223 |
| 2015 |
Chileshe, N., Rameezdeen, R., Hosseini, M. R., & Lehmann, S. (2015). Barriers to implementing reverse logistics in South Australian construction organisations. Supply chain management, 20(2), 179-204. DOI |
| 2014 |
Hosseini, M. R., Chileshe, N., Rameezdeen, R., & Lehmann, S. (2014). Reverse logistics for the construction industry: lessons from the manufacturing context. International journal of construction engineering and management, 3(3), 75-90. DOI |
| 2014 |
Perera, B. A. K. S., Rameezdeen, R., Chileshe, N., & Hosseini, M. R. (2014). Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: a Delphi approach. International journal of construction management, 14(1), 1-19. DOI |
| 2014 |
Chileshe, N., & Kikwasi, G. J. (2014). Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, construction and architectural management, 21(3), 291-319. DOI |
| 2014 |
Palmer, J., Bennetts, H., Pullen, S., Zuo, J., Ma, T., & Chileshe, N. (2014). The effect of dwelling occupants on energy consumption: the case of heat waves in Australia. Architectural Engineering and Design Management, 10(1-2), 40-59. DOI Scopus11 WoS10 |
| 2014 |
Reza Hosseini, M., Chileshe, N., & Zillante, G. (2014). Investigating the factors associated with job satisfaction of construction workers in South Australia. Australasian Journal of Construction Economics and Building, 14(3), 1-17. DOI Scopus19 WoS13 |
| 2014 |
Ghoddousi, P., Alizadeh, B. T., Hosseini, M. R., & Chileshe, N. (2014). Implementing the international benchmarking labour productivity theoretical model: the case of Iranian construction projects. Benchmarking: an international journal, 21(6), 1041-1061. DOI |
| 2014 |
Fapohunda, J. A., & Chileshe, N. (2014). Essential factors towards optimal utilisation of construction resources. Journal of engineering, design and technology, 12(4), 461-474. DOI |
| 2014 |
Chileshe, N., & Kikwasi, G. J. (2014). Risk assessment and management practices (RAMP) within the Tanzania construction industry: implementation barriers and advocated solutions. International journal of construction management, 14(4), 239-254. DOI |
| 2014 |
Ghoddousi, P., Bahrami, N., Chileshe, N., & Hosseini, M. R. (2014). Mapping site-based construction workers' motivation: expectancy theory approach. Australasian journal of construction economics and building, 60(1), 14-77. DOI Scopus18 |
| 2013 |
Hosseini, M., Zuo, J., Chileshe, N., & Baroudi, B. (2013). A conceptual meta-framework for managing multicultural global virtual teams. International Journal of Networking and Virtual Organisations, 12(4), 310-330. DOI Scopus4 |
| 2013 |
Hosseini, M. R., & Chileshe, N. (2013). Global virtual engineering teams (GVETs): a fertile ground for research in Australian construction projects context. International journal of project management, 31(8), 1101-1117. DOI |
| 2013 |
Hosseini, M. R., Chileshe, N., Ghoddousi, P., Jahanshahloo, G. R., Katebi, A., & Saeedi, M. (2013). Performance evaluation for global virtual teams (GVTs): application of data envelopment analysis (DEA). International journal of business and management, 8(19), 122-136. DOI |
| 2013 |
Shokri Ghasabeh, M., & Chileshe, N. (2013). Knowledge management : barriers to capturing lessons learned from Australian construction contractors perspective. Construction innovation: information, process, management, 14(1), 108-134. DOI |
| 2013 |
Chileshe, N., Khatib, J. M., & Farah, M. (2013). The perceptions of tenants in the refurbishment of tower blocks. Facilities, 31(3/4), 119-137. DOI |
| 2013 |
Chileshe, N., Khatib, J. M., & Farah, M. (2013). The perception of contractor's and landlord's representatives in the refurbishment of tower blocks. Facilities, 31(11-12), 521-541. DOI |
| 2012 |
Yirenkyi Fianko, A. B., Chileshe, N., & Stephenson, P. (2012). Critical success factors of risk assessment and management processes (RAMP) implementation in Ghanaian construction related organisations. International journal of project organisation and management, 4(4), 379-396. DOI |
| 2012 |
Hashim, N. I., & Chileshe, N. (2012). Major challenges in managing multiple project environments (MPE) in Australia's construction industry. Journal of engineering, design and technology, 10(1), 72-92. DOI |
| 2012 |
Chileshe, N., & Dzisi, E. (2012). Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of engineering, design and technology, 10(2), 276-298. DOI |
| 2012 |
Khatib, J. M., Negim, E. M., Sohl, H. S., & Chileshe, N. (2012). Glass powder utilisation in concrete production. European journal of applied sciences, 4(4), 173-176. |
| 2012 |
Chileshe, N., & Yirenkyi Fianko, A. B. (2012). An evaluation of risk factors impacting construction projects in Ghana. Journal of engineering, design and technology, 10(3), 306-329. DOI |
| 2011 |
Chileshe, N., & Yirenkyi Fianko, A. B. (2011). Perceptions of threat risk frequency and impact on construction projects in Ghana : opinion survey findings. Journal of construction in developing countries, 16(2), 115-149. |
| 2011 |
Chileshe, N., & Zuo, J. (2011). Alternative measures of integration in construction: a critical review. Journal of construction, 4(1), 12-15. |
| 2010 |
Wilson, L., Arman, M., Zillante, G., Pullen, S., Zuo, J., & Chileshe, N. (2010). National housing policy in Australia: are new initiatives in affordable housing sustainable?. International Journal of Interdisciplinary Social Sciences, 5(2), 129-148. DOI |
| 2010 |
Pullen, S., Arman, M., Zillante, G., Zuo, J., Chileshe, N., & Wilson, L. (2010). Developing an assessment framework for affordable and sustainable housing. Australasian Journal of Construction Economics and Building, 10(1-2), 48-64. DOI WoS22 |
| 2010 |
Zulu, S., & Chileshe, N. (2010). Service quality of building maintenance contractors in Zambia: a pilot study. International journal of construction management, 10(3), 63-81. |
| 2010 |
Chileshe, N., & Haupt, T. (2010). The effect of age on the job satisfaction of construction workers. Journal of engineering, design and technology, 8(1), 107-118. DOI |
| 2010 |
Chileshe, N., & Haupt, T. (2010). An empirical analysis of factors impacting career decisions in South African construction industry : male and female high school students' perspectives. Journal of Engineering, Design and Technology, 8(2), 221-239. DOI |
| 2010 |
Agyakwa Baah, A., Chileshe, N., & Fugar, F. D. K. (2010). Perception of barriers to risk assessment and management practices (RAMP) deployment: Opinion Survey Findings. Journal of Construction, 3(2), 15-21. |
| 2009 |
Zulu, S., & Chileshe, N. (2009). Service quality and competitive advantage: a challenge for local Zambian contractors. Journal of construction, 2(2), 16-20. |
| 2007 |
W, M. W., Tookey, J., & Chileshe, N. (2007). Optimization of Construction Logistics: A Core Competency for A Future Construction Industry. International Journal of Construction Education and Research. |
| 2007 |
Khatib, M., Chileshe, N., & Sloan, S. (2007). Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), 159-172. DOI |
| 2007 |
Chileshe, N., & Haupt, T. (2007). Industry and academia perceptions of construction management education: the case of South Africa. The Journal for Education in the Built Environment. |
| 2007 |
Chileshe, N. (2007). Quality management concepts, principles, tools and philosophies: A valid methodology for deployment within UK construction-related SMEs. Journal of Engineering, Design and Technology, 5(1), 49-67. DOI |
| 2007 |
Chileshe, N., Haupt, T., & Fester, F. (2007). Assessing the readiness of building diplomates for the South African construction industry. The Journal for Education in the Built Environment. |
| 2006 |
Chileshe, N. (2006). The antecedents of total quality management deployment in construction-related SMEs. Construction Information Quarterly. |
| 2006 |
Chileshe, N., & Watts, N. (2006). Development of an integrated project partnering management (IPPM) system. Building Engineer Journal. |
| 2005 |
Chileshe, N., & Haupt, T. (2005). Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), 140-154. DOI |
| 2005 |
Miller, S., Haupt, T., & Chileshe, N. (2005). Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), 180-189. DOI |
| 2004 |
Watson, P., Chileshe, N., & Maslow, D. (2004). Deploying total quality management in Russia. The Quality Management Journal. |
Available For Media Comment.